Working with Tasks
Use the task list and board, change display options, open tasks, manage subtasks, select several tasks at once, and archive finished work.
List And Board
Every project tab, saved filter, cycle, and the No project page shows tasks as a List or a Board. Switch between them at the top of the Display menu.
- List groups tasks, indents subtasks under their parent, and supports keyboard navigation and multi-select.
- Board shows a lane per status or bucket. Drag a card to another lane to change its status or bucket. Each lane shows its task count beside its name and keeps an Add task button at the top, however far you scroll. Subtask cards sit, smaller, under their parent's card, or under a small parent row when the parent is in another lane. Parent cards count their subtasks.
Display options
Click Display beside the search bar to switch between list and board and change how tasks are arranged. Each tab remembers its own settings.
| Setting | Options |
|---|---|
| Grouping (list) | Status (default), Priority, Type, Bucket, Due date (Overdue, Today, This week, Later, No due date), Project (on filters that span projects), or No grouping |
| Columns (board) | Status or Bucket |
| Lanes (board) | Scroll sideways (default), or Wrap onto rows so every lane stays on screen in a narrow window. Wrapped lanes grow with their cards up to a limit, then scroll. |
| Ordering | Manual (default), Status, Priority, Type, Due date, Created, or Updated |
| Direction | Depends on the ordering, such as Highest first for priority, Settings order for type, or Soonest first for due date |
With Manual ordering, drag tasks to reorder them. With any other ordering, dragging on the board still changes status or bucket, but doesn't reorder.
Reading a row
A row shows the task's priority, status, ID, title, subtask progress (for example, 2 of 5 subtasks done), type, labels, bucket, cycle, due date, and created date. An icon marks tasks that have a description. In narrow panes, the ID, subtask count, and labels are hidden to save space.
Closed tasks sink to the bottom of their group. When a group has open tasks, its closed ones fold into a single row such as 3 closed. Click it to unfold them in place. Groups can also be collapsed from their header, and each list remembers which groups you collapsed.
Subtasks sit under their parent with a tree line. If a subtask lands in a different group from its parent, a dimmed copy of the parent heads it so you can still see where it belongs.
Keyboard Shortcuts
In a task list:
| Key | Action |
|---|---|
J / K or arrow keys | Move down or up |
Enter or O | Open the task |
C | New task |
/ | Search |
S | Change status |
P | Set priority |
L | Edit labels |
T | Set type |
D | Set due date |
M | Move to project |
B | Move to bucket |
Y | Move to cycle |
X | Select or deselect the task |
Shift + J / Shift + K | Extend the selection |
Cmd/Ctrl + A | Select every task |
Esc | Clear the selection, then leave the list |
On a task's page, the same pickers work, plus C to comment, E to edit the title, J / K for the next and previous task, and Esc to go back to the list.
The Task Page
Open a task to see it full-size in the Tasks tab. The header has:
- Back to the list you came from (
Esc). - A breadcrumb that starts with the project, then the parent task's title if any, then the task's ID and title.
- The task's position in its list, such as 2 / 4, with Previous task and Next task buttons.
- A … menu with Make subtask of… or Make a regular task, Copy link, Archive task, and Delete task.
Below the title you'll find the description, which saves as you type (press Cmd/Ctrl + S or Cmd/Ctrl + Enter to save immediately), then Subtasks, then Activity.
On wide panes, a panel beside the task always shows:
- Actions: copy the task's Link, ID, or Wikilink.
- Properties: status, priority, type, labels, project, bucket, cycle, and due date. Parent shows only on subtasks, and Space only on a task outside any project.
- Resources, Links to, and Mentioned in. See Seeing what links to a task.
- Details: when the task was created, updated, completed, or cancelled.
In narrow panes the copy buttons sit above the title, and a compact strip under the title gives you the same property controls. The same properties also show in the right sidebar under Task Info.
J and K step through the list the task was opened from, even when you opened it in a new tab. If you edit a task so it leaves the list, J carries on from where it stood.
Due dates offer Today, Tomorrow, Next week, and Clear, plus a date picker. In the list or board, press D for the same choices, or type a date.
Activity and comments
The Activity timeline records when a task was created, each status change, project moves, and archive and restore. Changes made together are grouped into one entry with a short summary. Type in Leave a comment… and click Comment (or press Cmd/Ctrl + Enter) to add a note to the timeline.
Comments are Markdown. Task links, project links, and [[Note]] links in comments look as they do in a note, and task IDs such as WEB-24 are clickable. Web links in a comment unfurl as cards below its text.
Hover a comment to Edit or Delete it. Editing uses the same editor as the description: press Cmd/Ctrl + Enter to save or Esc to cancel. An edited comment is marked (edited); hover the mark to see when. Delete asks you to confirm first. Only comments can be changed; the rest of the history stays as it happened. You can also edit or delete comments from the CLI.
Comments are searchable from workspace search and the task list's search bar.
To hide comments for a workspace, turn off Comments in task settings. Existing comments are hidden, not deleted.
Subtasks
Add subtasks from the Subtasks section of a task's page with Add subtask. Press Enter to add another, or Esc to stop. Tick a subtask's checkbox to complete it.
- Subtasks go one level deep: a subtask can't have its own subtasks.
- A subtask always belongs to its parent's project. Its project field shows Inherited from parent. To move it, move the parent.
- New subtasks start in their parent's cycle, and subtasks follow their parent when it joins one.
Right-click a subtask on its parent's page to open it, change its status, priority, or cycle, or choose Make a parent task, which turns it back into a regular task. A toast confirms the change and offers Go to task.
To file an existing task under another, use Make subtask of… from the task's … menu, the row's context menu, or the Command Bar. Type to search every possible parent. The task's own project is listed first.
Closing a task with open subtasks
When you complete or cancel a task that still has open subtasks, Octarine asks Complete subtasks too? Choose Mark all Done to close them together, or Go back to leave everything as it was. This applies wherever you close the task: the list, the board, the bulk bar, the Command Bar, or the properties panel.
Working With Several Tasks
In the list, select tasks with the hover checkbox, X, Cmd/Ctrl-click, Shift-click, Shift + J / Shift + K, or Cmd/Ctrl + A. A bar appears at the bottom showing N selected with:
- Status (
S), Priority (P), Type (T), Labels (L), Project (M), Bucket (B), Cycle (Y), and Due date (D) - Archive or Restore
- A clear button (
Esc)
Project appears only when the selection includes a task that isn't a subtask, Bucket only when the workspace has buckets, and Cycle only when cycles are on. To complete several tasks, use Status.
After a bulk change, a toast such as Updated 4 tasks offers Undo. If some tasks changed elsewhere in the meantime, Octarine tells you how many couldn't be updated.
Right-clicking a selection gives the same actions in a menu, plus Copy as wikilinks, Copy links, Copy IDs, Archive N tasks, and Delete N tasks. Multi-select works in the list layout only.
The Task Context Menu
Right-click any task for:
- Open and Open in new tab
- Status, Priority, Type, Bucket, Labels, Project, and Cycle submenus, with the same shortcut letters as the list. With several tasks checked, they change all of them.
- Make subtask of or Make a regular task
- Mark as done or Reopen
- Copy as wikilink, Copy link, and Copy ID. See Linking and Deep Links.
- Save as template, which creates a template from the task. The toast's Edit button opens it in settings.
- Archive task or Restore task
- Delete task
Archiving
Archive tasks you want out of the way but don't want to delete. Archived tasks are hidden from lists and search unless you search with is:archived. An archived task's page shows This task is archived. with a Restore button.
Deleting
Delete task removes a task for good, along with its subtasks, comments, and history. It's in the task's … menu and its right-click menu, and Octarine asks you to confirm first, since this can't be undone. To delete a whole project, see Projects.
Links to a deleted task in notes show a warning chip. Hover over it for the reason.
Tabs And Navigation
Moving a task to another project, from the list, the Command Bar, the right-click menu, or its properties, shows where it went and offers Undo.
Tasks open in tabs like notes do. A task tab's title shows its ID and title, such as WEB-24 · Fix sync conflict. When you reopen Octarine, a task tab comes back on the task, with Back leading to the list it was opened from. Following a link to a task that's already open in another tab switches to that tab instead of opening a duplicate.
Tasks, projects, filters, and cycles also appear in Recently Viewed.